VHSoft
introducing mobile project monitoring system
Construction
industry and property maintenance industry have many aspects
in common. For example, as the area of the site and property
is usually huge, there may be large numbers of contractors,
working parties and engineers working together in different
places of the site and property at the same time. Such situation
may require the administration team to spend huge amount
of human resources and time in checking the attendance and
monitoring the work progress. To resolve this problem and
increase the operation efficiency of construction industry
and property maintenance industry, VHSoft Technologies Co.,
Ltd., a subsidiary of Yau Lee Holdings Limited and a leader
in construction information technology, introduces a mobile
workforce monitoring system using the latest smart card
and PDA technologies.
As CEO of VHSoft Technologies
Co., Ltd., Mr. Conrad Wong indicated, "The workforce
monitoring system currently employed by the industry mainly
relay on manual methods, and thus is inefficient and lack
of transparency. In order to check the workers' performance
and work progress, the administration staff have to walk
the site regularly. A well-designed management system should
not only maintain a huge database but also accumulate data
that are easy to retrieve and compatible with different
interfaces and systems for data transfer. Therefore, a system
that combines the highly flexible PDA with desktop workstation
can record and analyze related information, thus improves
the productivity and competitiveness of the company. Besides,
the system is so easy to use that workers can use it instantly
without further training."
Completeness
in recording personal data
The highly traceable PDA can
record the personal data and attendance of worker, for example,
name, identity card number and working permit number for
identity verification, which can control the entry flow
of the site effectively. In addition, some important data,
such as, skills and professional qualifications of the worker,
the number of working days and arrival and departure time
of worker, can also be recorded. Only download the data
to desktop or other systems, company can allocate human
resources according to the work progress after data analysis,
and thus, avoid surplus of human resources.
Monitoring work progress
Through the use of PDA, management
be acquainted with where the worker is working within the
site, be familiar with the work progress and ensure the
quality is up to standard. Together with digital camera,
management can monitor the site simultaneously and mark
reference on PDA for follow up actions which reduce time
spent and make prompt correction if problems found, the
production cost will then be greatly reduce as fewer mistake
is anticipated under this situation.
Efficient resources allocation
As PDA can record and analyze
the data of worker's performance and work progress, it helps
human resources planning and delivery of building materials,
so that an accurate estimation of budget and completion
date can be achieved, resources allocation is more flexible
which lead to a better cost control.
Developed by local and Nanjing
talents
Construction project PDA system
is developed by VHSoft Technologies Co., Ltd. and Nanjing
University, together with the experiences of Yau Lee Holdings
Limited in construction industry and construction management
concept of HK Polytechnic University, it can completely
satisfy the need of construction professional and lead the
industry towards information technology.
|